Search





 

PRODUCTION SECTION

Training Course Syllabus

1.   Mining Operation (3 days)

  • Quarry exploitation plans
  • Quarry scheduling optimization
  • Government quarry safety regulation
  • Exploration method
  • Rehabilitation system
  • Drilling & blasting techniques
  • Management of mobile equipment
  • Loading and hauling techniques
  • Mine surveying
  • Road maintenance
  • Overview of hydraulics, mobile plant
  • Equipment related safety 
  • Contracting out the quarry operation
  • Quarry development
  • Technique Revegetation and Reclamation
  • Quarrying Operation
  • Crushing and Pre homogenizing
  • Raw Grinding Systems
  • Coal Mill
  • Kiln Systems : SP, Kiln, Cooler
  • Refractory
  • Cement Grinding
  • Cement Chemistry
  • Bag Plant
  • Pollution Control
  • Quarrying Operation
  • Crushing and Pre homogenizing
  • Bulk Solid Storage
  • Grinding/Comminution Engineering
  • Separators
  • Coal Mill Systems: Operation, Parameters, Trouble
  • Raw Grinding Systems : Operation, Parameters, Trouble
  • Burners and Flames
  • Combustion Engineering
  • Alternative Fuels
  • Circulation Phenomena
  • Kiln Systems Operation Principles, Parameters, Trouble
  • Refractory Technology
  • Mass and Heat Balance of Kilns System
  • Mass and Heat Balance of Mill System
  • Cement Grinding Systems : Operation, Parameters, Trouble
  • Grinding Media
  • Main Fans
  • Raw Mix Design
  • Cement Chemistry
  • Quality Control
  • Dedusting System
  • Gas Analyzing Systems

2.   Cement Manufacturing Course Level 1 (3 days)

3.   Cement Manufacturing Course Level 2 (5 days)

4.   General Safety Training (3 days)

  • Awareness of HSE Management System
  • Company safety policy
  • Safety procedures
  • Emergency procedure
  • Emergency response : fire, earthquake, bomb treat
  • Fire extinguisher
  • First aid procedures
  • Incident investigation
  • Safety observation

5.   Specific Safety Training (3 days)

  • Electrical Safety
    • Power on/off procedure
    • Lock out procedure
    • Starting procedure
    • Mechanical Safety
      • Materials and equipment lifting procedure
      • Welding safety
      • Tools machining safety procedures
      • Fire Extinguisher
      • Hazard Identification & Risk Assessment
      • Lock off procedures
      • Equipment entry procedures
      • Handling flammable materials
      • Safety Induction Development
      • Personal Protective Equipment (PPE)
        • Usage Procedure and Monitoring
        • Safety Inspections on
          • Construction Equipment
          • Chemicals
          • Heavy equipment mobile plant safety
          • Drilling and blasting safety
          • Hazard Identification & Risk Assessment                   
          • Work permit system                                                                            
            • Convince space                                    
            • Hot work Lock Out Tag Out (LOTO)                           
            • Scaffolding
            • Job Safety Analysis      
            • OSH Expert                
            • Monitoring and Measurement                                     
            • Ambient air measurement, noise mapping, vibration mapping          
            • Equipment certification                       

 

6.   Environment System Management (3 days)

  • ISO 14000 standard
  • Environmental Aspects
  • Monitoring and Measurement
  • Impact Analysis
  • Environmental Auditing
  • Explosive Materials
  • Inspections of emission including noise, vibration, dust
  • Emission Monitoring and Reporting
  • Waste Material Handling
  • Environmental Management Program
  • Environmental Regulation
  • Hazardous Material Handling
  • Destruction Removal Efficiency
  • Auditor training

 

7.   Quality Management System (3 days)

  • The concept of Quality
  • ISO 9000 role
  • Quality Control Circle
  • Meeting Customer's Requirements
  • Achieving Quality
  • The Principles governing the ISO Standard for QMS
  • Quality Management System Requirements
  • Steps to implement the system
  • Management of Internal Audits
  • Management of Data
  • Review of the System
  • Management Responsibility
  • Resource Management
  • Product realization
  • Measurement, analysis and improvement

 

8.   Kiln Process Operation (5 days)

  • Process and Kiln System -Basic Principles of Operation
  • Combustion Theory
  • Fuel Types and Their Characteristics
  • Raw Material Characteristics
  • The analytical background for the chemical and physical process
  • Optimization of Heat Consumption.
  • Kiln Refractory
  • Mass and Heat Balances
  • Emission of NOx and sax from Cement Kilns
  • NOx and sax in Clinker Burning Installations
  • Starting and Stopping the Kiln
  • Emergency Situations during Kiln Operation
  • Evaluation of kiln operation
  • Kiln System Process Control
  • Control Parameters
  • Location of the control parameters and variables
  • Preheater kiln
  • Precalciner kiln
  • Burning Zone Temperature (BZT)
  • Pyrometer reading
  • NOx of the exhaust gases
  • Kiln torque
  • Secondary Air Temperature.  Tertiary Air Temperature
  • Back End Temperature (BET)
  • Oxygen control
  • Control Variables
  • Fuel rate to the kiln
  • Feed rate to the kiln
  • Kiln draft
  • Kiln speed
  • Control Strategy
    • Possible kiln parameter conditions
    • Decision tree
    • Counteractions
  • Precalciner Control
    • Calcination temperature
    • Oxygen control
    • Other control parameters

 

  • Grate Cooler Control
  • Bed height and grate speed
  • Control Parameters and Variables
  • Actions to handling specific parameters and constraints
  • Inspection Strategies for Kiln Systems
  • Limits Regarding Kiln Charge

 

9.   Kiln Process Technology (3 days)

  • Kiln Systems
  • Refractory Linings
  • Firing Systems
  • Burners and Flames
  • Combustion Engineering
  • Alternative Fuels
  • Circulation Phenomena
  • Kiln Control
  • Mass and Heat Balance
  • Main Fans
  • Process and Equipment Modification
  • Kiln System Audit

 

10.       Coal Mill Operation (3 days)

  • Design of Process, Machinery and Basic Principles of Operation
  • Mechanical Features of the Mill
  • Drying and Grinding of Coal
  • Coal Mill Department Layout
  • Mill Components
  • Operation of the Vertical Mill
  • Methods for safe operation and handling of coal
  • Start-up, shut-down and trouble-shooting
  • Coal Grinding Mill with Inert Drying Air 

 

11.       Basic Principles of Sampling Methods and Equipment (3 days)

  • Introduction
  • Sampling Regime
  • Basic considerations
  • Guidelines for sample size and sampling frequency
  • Sampling of Stationary Materials
  • Field sampling
  • Sampling of bulk cement
  • Sampling of Conveyed Material
  • Various possibilities of collecting a transverse sample
  • Deviations from the ideal case
  • Rules for the sampler
  • Recapitulation of sampling rules
  • Critical Analysis of The Best Known Samplers
    • Apparatus for transverse sampling with linear movement
    • Equipment for Transverse Sampling with a Rotary Motion
    • Equipment for Longitudinal Samples
    • Equipment for Quasi-Point Samples
    • Experimental Assessment of Samplers
    • Implement and Adequate Sampling Methods
    • Reliability of Test Result

12.       Refractory (3 days)

  • General Introduction
  • Classification of Refractory Products
  • Manufacture of Refractory Products
  • Testing of Unused Refractory
  • Zoning of Cement Kilns
  • Wear of Kiln Refractory
  • Chemical Reactions Producing Refractory Damage
  • Coating Properties and Behavior
  • Influencing Parameters

13.       Raw Mill Systems (4 days)

  • Purpose of Raw Grinding
  • Raw Material Properties and Product Quality
  • Basic Raw Grinding Equipment
    • Available Raw Grinding Equipment
    • Selection Criteria for Raw Grinding Equipment
    • Drying
      • Heat Sources
      • Drying Possibilities
      • Drying Performance
      • Raw Grinding System
        • Raw Grinding System with End-Discharge Mill
        • Raw Grinding System with Center Discharge Mill
        • Raw Grinding System with Air Swept Mill
        • Raw Grinding System with Vertical Roller Mill
        • Raw Grinding System with Roller Press
        • Comparison
          •  Performance
          •  Energy Consumption
          •  Grinding Installation

14.       Ball Mill Operation (Raw Mill or Cement Mill) (3 days)

  • Design of Ball Mills and Basic Principles of Operation
  • Mass and Heat Balances
  • Grinding of Raw Materials
  • Drying and Grinding of Coal
  • Cement Grinding
  • Ball Mill Operation
  • Performance Testing of Ball Mill
  • Optimization of Mill Grinding Systems
  • Aspects and parameters in ball mill operation
  • Evaluation of ball mill operation
  • Responses to parameter variations during operation
  • Manipulation and parameter variation  

 

15.       Operation of Vertical Mill (3 days)

  •  Design of Vertical Mills and Basic Principles of Operation
  • Mass and Heat Balances
  • Grinding of Raw Materials
  • Drying and Grinding of Coal
  • Roller Mill Operation
  • Mill operation and parameters
    • Obtain optimal results from various given inputs and constraints
    • Supervise mill operation
    • Operate the mill system within inputs, variables and constraints.
    • Required actions and set points plant operation.
    • Analyze disturbances in the mill operation

16.       Cement Mills System (3 days)

  •  Introduction
  • Grinding with Tube Mills
  • Mill Types
  • Type of material being ground
  • Number of chambers
  • Material transport
    • Discharge point of material
    • Grinding process
    • Elements of Tube Mills
    • External Elements
    • Feed arrangements
    • Discharge
    • Mill shell
    • Mill heads
    • Mill bearings
    • Mill drives
    • Internal Elements
    • Overview
    • Head liners
    • Shell liners
    • Intermediate diaphragm
    • Discharge diaphragm
    • Grinding media
    • Mill Control
    • Optimal mill load
    • Adjustment possibilities
    • Process parameters
    • Handling parameters
    • Mill Operating Performance
    • Mill efficiency
    • Separator efficiency
    • Mill ventilation, heating and cooling
    • Grinding aids (GA)
    • Grinding media charges
    • Grinding media charge compositions
    • Grinding media sizes
    • Ball charge calculation
    • Replenishment of ball charges
    • Ball charge management

 

17.       Cement Grinding Technology (3 days)

  •  Overview grinding systems
  • Requirements
  • Grinding systems
  • Tube Mill Systems
  • Tube Mill in Open Circuit
  • Tube Mill in Closed Circuit
  • Tube Mill Systems with Pregrinding Unit
  • Roller Press
  • Vertical Shaft Impact Crusher
  • Vertical Roller Mill
  • Finish Grinding Systems
  • Roller Press
  • Vertical Roller Mill
  • Horizontal Roller Mill
  • Comparison

18.       Plant Audit (3 days)

  •  Philosophy of Plant Audit
  • Energy
  • Main Equipment of Cement Plant
  • Conveying and Storage
  • Electrical Equipment
  • Pump, Blower, Compressor
  • Raw Mill System Audit
  • Kiln System Audit
  • Cement Mill System Audit

 

19.       Crusher Operation (3 days)

  •  Manuals Operation
  • Access and Lifting Gear
  • Cleanliness
  • Oil Analysis
  • Operation and Maintenance Log
  • Safety
  • Minor Maintenance

 

20.       Quality Assurance (3 days)

  • Introduction
  • Definition of Quality
  • Objectives of QA
  • Activities of QA
    • Quality Planning
    • Quality Control
    • Quality Audit
    • QA system
      • The Elements of a Quality Assurance System
      • Organization of Quality Assurance
      • Quality Assurance Handbook
      • Quality Cost
        • Introduction
        • Elements of Quality Costs
        • Relationship of Quality Costs to Sales

 

 

21.       Cement Quality (3 days)

  •  Chemical analyses of raw meal and other materials
  • Calculation of the raw mix composition and sampling methods
  • Composition of raw mix and clinker characteristics
  • Methods for evaluation of cement quality
  • Chemical changes in cement during grinding and storage
  • Blended Cement
  • Cement Grinding
  • Portland Cement  and Concrete Technology
  • X-Ray Analysis
  • Sampling and Sample Preparation from Crushing and Grinding
  • Burnability of Raw Mix
  • Quality Control; Laboratory
  • Grindability of Clinker
  • Influence of Manufacturing Parameters on Clinker

 

22.       Quality Control: Concept, Control Plan, Procedures (3 days)

  •  Introduction
  • Quality Control Concept
  • Control Plan
  • Control Parameters
    • Supplied Materials
    • Quarry
    • Pre-blending
    • Raw Meal
    • Kiln Feed
    • Hot meal
    • Clinker
    • Ground Cement
    • Dispatched Cement
    • Ground Coal
    • Uniformity
    • Sampling, Preparation and Testing
    • Quality and Testing Standard (ASTM, SNI, JIS etc.)
    • QCX/Proportioner or QCX/Blend Expert
    • Introduction Microscopy

 

23.       Raw Mix Design (3 days)

  •  General
  • Definition of Criteria for Mix Calculation
  • Principles and Methods of Mix Proportioning
  • X-Ray Pattern
  • Manual Calculation
  • Graphical Methods
  • Programmable Calculator
  • Computer Optimization
    • Raw Mix Assessment
    • Mix Type
    • Comparison of Raw Mix with Standard Specifications
    • Mineralogical Composition of Cement Raw Mixes.
    • Raw Mixes with regard to Cement Production
    • Evaluation of Laboratory Test Results
      • QCX/Proportioner or QCX/Blend Expert

 

24.       Laboratory (3 days)

  • Sample and Preparation
    • Methods
    • Application
    • Time of Preparation
    • Maintenance of Sampling Equipments
    • Suppliers
    • Laboratory Equipment
    • Gravimetri
    • Titration of Carbonates
    • Complexometric Titration
    • Blaine
    • Determination of Sulphur and Carbon Dioxide
    • Atomic Emission Spectrometry
    • X-Ray Fluorecence
    • X-RAY Diffraction
    • Microscopy
    • Thermal Shock Testing of Basic Refractories
    • Differential Thermal Analysis (DTA)
    • Thermo Gravimetric Analysis(TGA)
    • Maintenance of Testing Equipments
    • Standards understanding and application
      • ASTM
      • JIS
      • British standards
      • Singapore standards
      • Australian standards