PRODUCTION SECTION
Training Course Syllabus
1. Mining Operation (3 days)
- Quarry exploitation plans
- Quarry scheduling optimization
- Government quarry safety regulation
- Exploration method
- Rehabilitation system
- Drilling & blasting techniques
- Management of mobile equipment
- Loading and hauling techniques
- Mine surveying
- Road maintenance
- Overview of hydraulics, mobile plant
- Equipment related safety
- Contracting out the quarry operation
- Quarry development
- Technique Revegetation and Reclamation
- Quarrying Operation
- Crushing and Pre homogenizing
- Raw Grinding Systems
- Coal Mill
- Kiln Systems : SP, Kiln, Cooler
- Refractory
- Cement Grinding
- Cement Chemistry
- Bag Plant
- Pollution Control
- Quarrying Operation
- Crushing and Pre homogenizing
- Bulk Solid Storage
- Grinding/Comminution Engineering
- Separators
- Coal Mill Systems: Operation, Parameters, Trouble
- Raw Grinding Systems : Operation, Parameters, Trouble
- Burners and Flames
- Combustion Engineering
- Alternative Fuels
- Circulation Phenomena
- Kiln Systems Operation Principles, Parameters, Trouble
- Refractory Technology
- Mass and Heat Balance of Kilns System
- Mass and Heat Balance of Mill System
- Cement Grinding Systems : Operation, Parameters, Trouble
- Grinding Media
- Main Fans
- Raw Mix Design
- Cement Chemistry
- Quality Control
- Dedusting System
- Gas Analyzing Systems
2. Cement Manufacturing Course Level 1 (3 days)
3. Cement Manufacturing Course Level 2 (5 days)
4. General Safety Training (3 days)
- Awareness of HSE Management System
- Company safety policy
- Safety procedures
- Emergency procedure
- Emergency response : fire, earthquake, bomb treat
- Fire extinguisher
- First aid procedures
- Incident investigation
- Safety observation
5. Specific Safety Training (3 days)
- Electrical Safety
- Power on/off procedure
- Lock out procedure
- Starting procedure
- Mechanical Safety
- Materials and equipment lifting procedure
- Welding safety
- Tools machining safety procedures
- Fire Extinguisher
- Hazard Identification & Risk Assessment
- Lock off procedures
- Equipment entry procedures
- Handling flammable materials
- Safety Induction Development
- Personal Protective Equipment (PPE)
- Usage Procedure and Monitoring
- Safety Inspections on
- Construction Equipment
- Chemicals
- Heavy equipment mobile plant safety
- Drilling and blasting safety
- Hazard Identification & Risk Assessment
- Work permit system
- Convince space
- Hot work Lock Out Tag Out (LOTO)
- Scaffolding
- Job Safety Analysis
- OSH Expert
- Monitoring and Measurement
- Ambient air measurement, noise mapping, vibration mapping
- Equipment certification
6. Environment System Management (3 days)
- ISO 14000 standard
- Environmental Aspects
- Monitoring and Measurement
- Impact Analysis
- Environmental Auditing
- Explosive Materials
- Inspections of emission including noise, vibration, dust
- Emission Monitoring and Reporting
- Waste Material Handling
- Environmental Management Program
- Environmental Regulation
- Hazardous Material Handling
- Destruction Removal Efficiency
- Auditor training
7. Quality Management System (3 days)
- The concept of Quality
- ISO 9000 role
- Quality Control Circle
- Meeting Customer's Requirements
- Achieving Quality
- The Principles governing the ISO Standard for QMS
- Quality Management System Requirements
- Steps to implement the system
- Management of Internal Audits
- Management of Data
- Review of the System
- Management Responsibility
- Resource Management
- Product realization
- Measurement, analysis and improvement
8. Kiln Process Operation (5 days)
- Process and Kiln System -Basic Principles of Operation
- Combustion Theory
- Fuel Types and Their Characteristics
- Raw Material Characteristics
- The analytical background for the chemical and physical process
- Optimization of Heat Consumption.
- Kiln Refractory
- Mass and Heat Balances
- Emission of NOx and sax from Cement Kilns
- NOx and sax in Clinker Burning Installations
- Starting and Stopping the Kiln
- Emergency Situations during Kiln Operation
- Evaluation of kiln operation
- Kiln System Process Control
- Control Parameters
- Location of the control parameters and variables
- Preheater kiln
- Precalciner kiln
- Burning Zone Temperature (BZT)
- Pyrometer reading
- NOx of the exhaust gases
- Kiln torque
- Secondary Air Temperature. Tertiary Air Temperature
- Back End Temperature (BET)
- Oxygen control
- Control Variables
- Fuel rate to the kiln
- Feed rate to the kiln
- Kiln draft
- Kiln speed
- Control Strategy
- Possible kiln parameter conditions
- Decision tree
- Counteractions
- Precalciner Control
- Calcination temperature
- Oxygen control
- Other control parameters
- Grate Cooler Control
- Bed height and grate speed
- Control Parameters and Variables
- Actions to handling specific parameters and constraints
- Inspection Strategies for Kiln Systems
- Limits Regarding Kiln Charge
9. Kiln Process Technology (3 days)
- Kiln Systems
- Refractory Linings
- Firing Systems
- Burners and Flames
- Combustion Engineering
- Alternative Fuels
- Circulation Phenomena
- Kiln Control
- Mass and Heat Balance
- Main Fans
- Process and Equipment Modification
- Kiln System Audit
10. Coal Mill Operation (3 days)
- Design of Process, Machinery and Basic Principles of Operation
- Mechanical Features of the Mill
- Drying and Grinding of Coal
- Coal Mill Department Layout
- Mill Components
- Operation of the Vertical Mill
- Methods for safe operation and handling of coal
- Start-up, shut-down and trouble-shooting
- Coal Grinding Mill with Inert Drying Air
11. Basic Principles of Sampling Methods and Equipment (3 days)
- Introduction
- Sampling Regime
- Basic considerations
- Guidelines for sample size and sampling frequency
- Sampling of Stationary Materials
- Field sampling
- Sampling of bulk cement
- Sampling of Conveyed Material
- Various possibilities of collecting a transverse sample
- Deviations from the ideal case
- Rules for the sampler
- Recapitulation of sampling rules
- Critical Analysis of The Best Known Samplers
- Apparatus for transverse sampling with linear movement
- Equipment for Transverse Sampling with a Rotary Motion
- Equipment for Longitudinal Samples
- Equipment for Quasi-Point Samples
- Experimental Assessment of Samplers
- Implement and Adequate Sampling Methods
- Reliability of Test Result
12. Refractory (3 days)
- General Introduction
- Classification of Refractory Products
- Manufacture of Refractory Products
- Testing of Unused Refractory
- Zoning of Cement Kilns
- Wear of Kiln Refractory
- Chemical Reactions Producing Refractory Damage
- Coating Properties and Behavior
- Influencing Parameters
13. Raw Mill Systems (4 days)
- Purpose of Raw Grinding
- Raw Material Properties and Product Quality
- Basic Raw Grinding Equipment
- Available Raw Grinding Equipment
- Selection Criteria for Raw Grinding Equipment
- Drying
- Heat Sources
- Drying Possibilities
- Drying Performance
- Raw Grinding System
- Raw Grinding System with End-Discharge Mill
- Raw Grinding System with Center Discharge Mill
- Raw Grinding System with Air Swept Mill
- Raw Grinding System with Vertical Roller Mill
- Raw Grinding System with Roller Press
- Comparison
- Performance
- Energy Consumption
- Grinding Installation
14. Ball Mill Operation (Raw Mill or Cement Mill) (3 days)
- Design of Ball Mills and Basic Principles of Operation
- Mass and Heat Balances
- Grinding of Raw Materials
- Drying and Grinding of Coal
- Cement Grinding
- Ball Mill Operation
- Performance Testing of Ball Mill
- Optimization of Mill Grinding Systems
- Aspects and parameters in ball mill operation
- Evaluation of ball mill operation
- Responses to parameter variations during operation
- Manipulation and parameter variation
15. Operation of Vertical Mill (3 days)
- Design of Vertical Mills and Basic Principles of Operation
- Mass and Heat Balances
- Grinding of Raw Materials
- Drying and Grinding of Coal
- Roller Mill Operation
- Mill operation and parameters
- Obtain optimal results from various given inputs and constraints
- Supervise mill operation
- Operate the mill system within inputs, variables and constraints.
- Required actions and set points plant operation.
- Analyze disturbances in the mill operation
16. Cement Mills System (3 days)
- Introduction
- Grinding with Tube Mills
- Mill Types
- Type of material being ground
- Number of chambers
- Material transport
- Discharge point of material
- Grinding process
- Elements of Tube Mills
- External Elements
- Feed arrangements
- Discharge
- Mill shell
- Mill heads
- Mill bearings
- Mill drives
- Internal Elements
- Overview
- Head liners
- Shell liners
- Intermediate diaphragm
- Discharge diaphragm
- Grinding media
- Mill Control
- Optimal mill load
- Adjustment possibilities
- Process parameters
- Handling parameters
- Mill Operating Performance
- Mill efficiency
- Separator efficiency
- Mill ventilation, heating and cooling
- Grinding aids (GA)
- Grinding media charges
- Grinding media charge compositions
- Grinding media sizes
- Ball charge calculation
- Replenishment of ball charges
- Ball charge management
17. Cement Grinding Technology (3 days)
- Overview grinding systems
- Requirements
- Grinding systems
- Tube Mill Systems
- Tube Mill in Open Circuit
- Tube Mill in Closed Circuit
- Tube Mill Systems with Pregrinding Unit
- Roller Press
- Vertical Shaft Impact Crusher
- Vertical Roller Mill
- Finish Grinding Systems
- Roller Press
- Vertical Roller Mill
- Horizontal Roller Mill
- Comparison
18. Plant Audit (3 days)
- Philosophy of Plant Audit
- Energy
- Main Equipment of Cement Plant
- Conveying and Storage
- Electrical Equipment
- Pump, Blower, Compressor
- Raw Mill System Audit
- Kiln System Audit
- Cement Mill System Audit
19. Crusher Operation (3 days)
- Manuals Operation
- Access and Lifting Gear
- Cleanliness
- Oil Analysis
- Operation and Maintenance Log
- Safety
- Minor Maintenance
20. Quality Assurance (3 days)
- Introduction
- Definition of Quality
- Objectives of QA
- Activities of QA
- Quality Planning
- Quality Control
- Quality Audit
- QA system
- The Elements of a Quality Assurance System
- Organization of Quality Assurance
- Quality Assurance Handbook
- Quality Cost
- Introduction
- Elements of Quality Costs
- Relationship of Quality Costs to Sales
21. Cement Quality (3 days)
- Chemical analyses of raw meal and other materials
- Calculation of the raw mix composition and sampling methods
- Composition of raw mix and clinker characteristics
- Methods for evaluation of cement quality
- Chemical changes in cement during grinding and storage
- Blended Cement
- Cement Grinding
- Portland Cement and Concrete Technology
- X-Ray Analysis
- Sampling and Sample Preparation from Crushing and Grinding
- Burnability of Raw Mix
- Quality Control; Laboratory
- Grindability of Clinker
- Influence of Manufacturing Parameters on Clinker
22. Quality Control: Concept, Control Plan, Procedures (3 days)
- Introduction
- Quality Control Concept
- Control Plan
- Control Parameters
- Supplied Materials
- Quarry
- Pre-blending
- Raw Meal
- Kiln Feed
- Hot meal
- Clinker
- Ground Cement
- Dispatched Cement
- Ground Coal
- Uniformity
- Sampling, Preparation and Testing
- Quality and Testing Standard (ASTM, SNI, JIS etc.)
- QCX/Proportioner or QCX/Blend Expert
- Introduction Microscopy
23. Raw Mix Design (3 days)
- General
- Definition of Criteria for Mix Calculation
- Principles and Methods of Mix Proportioning
- X-Ray Pattern
- Manual Calculation
- Graphical Methods
- Programmable Calculator
- Computer Optimization
- Raw Mix Assessment
- Mix Type
- Comparison of Raw Mix with Standard Specifications
- Mineralogical Composition of Cement Raw Mixes.
- Raw Mixes with regard to Cement Production
- Evaluation of Laboratory Test Results
- QCX/Proportioner or QCX/Blend Expert
24. Laboratory (3 days)
- Sample and Preparation
- Methods
- Application
- Time of Preparation
- Maintenance of Sampling Equipments
- Suppliers
- Laboratory Equipment
- Gravimetri
- Titration of Carbonates
- Complexometric Titration
- Blaine
- Determination of Sulphur and Carbon Dioxide
- Atomic Emission Spectrometry
- X-Ray Fluorecence
- X-RAY Diffraction
- Microscopy
- Thermal Shock Testing of Basic Refractories
- Differential Thermal Analysis (DTA)
- Thermo Gravimetric Analysis(TGA)
- Maintenance of Testing Equipments
- Standards understanding and application
- ASTM
- JIS
- British standards
- Singapore standards
- Australian standards